Electricity prices in Jemena (VIC) — 2026–27

Victorian Default Offer (ESC) · effective 1 July 2026

$1,563 /year derived at 4,000 kWh

Usage 27.5c/kWh · supply 127.1c/day (GST incl.) · -4.6% vs 2025–26

North-west Melbourne · source: ESC Victorian Default Offer 2026–27 · annual figure is a derived estimate from the published rates

Jemena reference rates, 2026–27 (GST inclusive)
TariffDaily supplyUsageAnnual
Residential (flat rate)127.1c/day27.5c/kWh$1,563*
Controlled load21.4c/kWh
Small business (flat rate)167.1c/day28.8c/kWh

* Derived estimate — published rates × 4,000 kWh + supply × 365, not a figure the regulator publishes.

Electricity bill estimator

Jemena

A 2-person household uses roughly 4,000–5,500 kWh a year.

$1,563 per year ≈ $391/quarter
Supply charge (127.1c/day × 365)
$464.02
Usage (27.5c/kWh × 4,000 kWh)
$1,098.80

Rates: ESC Victorian Default Offer 2026–27, effective 1 July 2026 (GST inclusive). This is the government reference/standing rate for North-west Melbourne — market offers can sit below it. Full Jemena price breakdown →

How Jemena compares

Residential flat-rate usage charge by zone, 2026–27
ZoneRegionUsage c/kWhSupply c/day
JemenaVIC27.5c127.1c
AusgridNSW33.1c166.2c
Endeavour EnergyNSW33.7c185.1c
Essential EnergyNSW35.0c272.2c
CitiPowerVIC26.0c121.1c
PowercorVIC28.2c138.1c
United EnergyVIC27.4c119.1c
AusNet ServicesVIC32.0c128.2c
EnergexQLD28.0c192.0c
Ergon EnergyQLD28.9c180.5c
SA Power NetworksSA41.9c180.1c
Western Power (SWIS)WA33.3c119.2c
Horizon PowerWA33.3c119.2c
TasNetworksTAS28.0c167.7c
EvoenergyACT37.0c134.2c
Power and WaterNT31.7c62.5c

Frequently asked questions

Why is a Jemena bill different from other areas?
Poles-and-wires costs differ by network. Jemena covers North-west Melbourne, and its network charges are built into the Victorian Default Offer (ESC) figures for this zone — so the same usage costs a different amount on a neighbouring network. Compare the other VIC zones or the national table below.
Is this what I actually pay?
This is the regulated standing rate — the default if you have never chosen a market plan. Market offers in Jemena's area can price below it, so treat these rates as the benchmark your own plan should beat.
What's controlled load?
A separately metered circuit — usually electric hot water — that the network can energise off-peak in exchange for a cheaper rate. In Jemena's zone the controlled-load usage rate is 21.4c/kWh, well under the anytime rate of 27.5c/kWh.
When do these prices change?
Every 1 July. The ESC Victorian Default Offer 2026–27 applies from 1 July 2026 to 30 June 2027; the next reset is 1 July 2027. This page is re-verified against the new determination each year.

Related

Sources — figures current as at 17 July 2026.

Rates apply 1 July 2026 – 30 June 2027 and reset every 1 July. Figures are the government reference/standing rates for this zone — retail market offers can differ.